Facility Transformation for Enhanced Production - Ambrey Baker
Different Dog

Facility Transformation for Enhanced Production

Client: Different Dog

Duration: 2 Months

Location: Telford

Year: 2025

Value: Undisclosed

Overview & Objectives

Different Dog is an innovative pet food company based in Telford, focused on delivering freshly cooked, all natural pet food. With rapid growth from a small start up to a robust team of 90 professionals, they needed a state-of-the-art facility to support their expanding operations. Ambrey Baker Construction was tasked with transforming their existing space into a modern kitchen and production hub.

Enhance Operational Efficiency: Optimise the layout and systems to improve workflow & streamline production processes

Achieve Compliance and Food Safety: Design and construct a facility that meets rigorous food safety standards, ensuring hygiene and regulatory compliance at every stage of production.

Maintain Continuous Production: Implement a temporary facility to sustain production levels and meet demand while the main upgrades are underway.

Plan for Scalability and Growth: Develop adaptable infrastructure to accommodate future expansions and evolving operational needs.

Scope of Work
  • Drainage System: Designed and installed a highc apacity drainage system, integrating durable piping through reinforced concrete, and conducted CCTV inspections for quality assurance. A new manhole was added to facilitate maintenance.
  • Cold Storage: Constructed cold storage units with custom-built insulated panels, food-safe silicone seals, and hygienic cladding, ensuring the safestorage of ingredients and products.
  • Temporary Facility: Developed a temporary facility with designated hand-wash areas, wash zones, and ingredient preparation rooms to maintain production during renovations.
  • Logistics Enhancements: Installed doors, ramps, and PVC curtains for better hygiene and operational efficiency.
  • Future-Proofing: Laid the groundwork for Phase Two, which will include expanding the mezzanine floor for office spaces and reconfiguring existing areas for increased functionality.

โ€œOur work with Different Dog has been a remarkable example of how thoughtful design and tailored solutions can make a significant impact on operational efficiency and growth. Weโ€™re proud to be part of their journey, ensuring that each phase of development is built on quality, compliance, and innovation to support their ambitious goals.โ€

โ€“ Carl Duffy – Commercial Director

Challenges & Solutions

Challenge: Insuring the drainage system could handle high production volumes.
Solution: Conducted thorough inspections and customized the piping and drainage layout for optimal capacity and durability.

Challenge: Aligning construction timelines with operational demands.
Solution: Phased the project strategically, completing Phase One to support immediate needs and planning Phase Two for future enhancements.

Challenge: Exceding requirements of food-grade construction standards.
Solution: Collaborated closely with Different Dogโ€™s team and sourced specialised materials like food safe cladding and silicone seals, ensuring compliance with industry regulations.

Leading Specialists in Industrial Facilities

Related case studies