End-to-End Factory Fit Out for a Major Ingredients Produce

Client: Confidential

Duration: 22 Weeks

Location: Holme Farm, Swineshead

Year: 2025

Value: Undisclosed

Overview & Objectives

Ambrey Baker was appointed as principal contractor for a full strip-out and rebuild of an existing processing space at Holme Farm. The project involved the delivery of a food-safe environment fit for high-care food production, complete with new mechanical and electrical systems, hygienic finishes and specialist installations.

Scope of Work
  • Full internal demolition and safe strip-out of redundant services
  • Food-safe wall, ceiling, and door systems throughout
  • Heavy-duty resin flooring with stainless steel drainage
  • Bespoke fit-out of blast chillers and ovens, including associated services
  • Cleanroom-standard corridors, lighting, and control installations
  • External façade upgrades, roofing improvements, new guttering and rainwater drainage installations, and a new canopy over the goods-in area
  • Access zone works and perimeter groundworks
  • New external concrete slab at goods-in

Challenges & Solutions

Live Site Coordination

The facility remained operational in adjacent areas throughout construction. Our team implemented strict segregation zones, sealed partitions, and staged delivery to eliminate production disruption.

Thermal & Hygiene Controls

To meet the client’s hygiene and temperature-critical processing needs, we installed:

  • Insulated food-safe panels
  • Crash-resistant chiller doors with temperature control systems
  • Extraction canopy with stainless steel fire-suppression pipework
  • Plug-and-play electrical power units for production line flexibility

Drainage & Cleanability

Custom resin flooring was laid with seamless coving and integral stainless-steel drainage. Washdown areas included kerbing, hose reels, and boot wash systems to ensure hygiene compliance.

Compressed Programme

With just 22 weeks on site, our team worked around the clock with parallel trades and phased inspections. All M&E and structural works were carefully coordinated using real-time scheduling.

Outcomes

Ambrey Baker delivered a high-performance, hygienic, and temperature-controlled production environment, suitable for fresh food preparation and downstream packaging operations. The upgraded facility now provides long-term durability, high cleanability, and compliance with food industry standards.